Skip to content

A gradual release of Avioverse begins in October 2026. Request early access →

NCC.POL.135 Landing – aeroplanes

ANNEX VI (Part-NCC) · Regulation (EU) No 965/2012 · EAR revision 27 Mar 2026

IRImplementing rule

NCC.POL.135Landing – aeroplanes

The pilot-in-command shall ensure that at any aerodrome or operating site, after clearing all obstacles in the approach path by a safe margin, the aeroplane shall be able to land and stop, or a seaplane to come to a satisfactorily low speed, within the landing distance available. Allowance shall be made for expected variations in the approach and landing techniques, if such allowance has not been made in the scheduling of performance data.

IR · NCC.POL.135 — Regulation (EU) No 965/2012 · Regulation (EU) No 800/2013 · Air OPS Easy Access Rules · EAR revision 27 Mar 2026

AMCAcceptable means of compliance

AMC1 NCC.POL.135Landing – aeroplanes

Show the text

GENERAL The following should be considered to ensure that an aeroplane is able to land and stop, or a seaplane to come to a satisfactorily low speed, within the landing distance available:

(a)the pressure altitude at the aerodrome;

(b)the runway surface condition and the type of runway surface;

(C)the runway slope in the direction of landing;

(d)not more than 50 % of the reported head-wind component or not less than 150 % of the reported tailwind component; and

(e)use of the most favourable runway, in still air;

(f)use of the runway most likely to be assigned considering the probable wind speed and direction and the ground handling characteristics of the aeroplane, and considering other conditions such as landing aids and terrain.

AMC · AMC1 NCC.POL.135 — Regulation (EU) No 965/2012 · ED Decision 2013/021/R · Air OPS Easy Access Rules · EAR revision 27 Mar 2026

AMCAcceptable means of compliance

AMC2 NCC.POL.135Landing – aeroplanes

Show the text

ALLOWANCES The allowances should be stated in the operations manual.

AMC · AMC2 NCC.POL.135 — Regulation (EU) No 965/2012 · ED Decision 2013/021/R · Air OPS Easy Access Rules · EAR revision 27 Mar 2026

GMGuidance material

GM1 NCC.POL.135Landing — aeroplanes

Show the text

WET AND CONTAMINATED RUNWAY DATA The determination of landing performance data should be based on information provided in the operations manual (OM) on the reported RWYCC. The RWYCC is determined by the aerodrome operator using the RCAM and associated procedures defined in ICAO Doc 9981 ‘PANS Aerodromes’. The RWYCC is reported through an RCR in the SNOWTAM format in accordance with ICAO Annex 15.

GM · GM1 NCC.POL.135 — Regulation (EU) No 965/2012 · ED Decision 2021/005/R · Air OPS Easy Access Rules · EAR revision 27 Mar 2026

All rules in SUBPART C: AIRCRAFT PERFORMANCE AND OPERATING LIMITATIONS

Consolidated from the EASA Easy Access Rules (revision 27 Mar 2026, extracted 17 Aug 2026) for convenience. Not the official publication — verify against the Official Journal of the European Union and the EASA publications before operational use.

Ask Metis about NCC.POL.135 →

Metis opens with Avioverse in October 2026 · request early access.