Skip to content

A gradual release of Avioverse begins in October 2026. Request early access →

GM3 Article 2(3) Scope

Commission Delegated Regulation (EU) 2025/20 · Regulations (EU) 2025/23 and 2025/24 · EAR revision 5 Nov 2025

GMGuidance material

GM3 Article 2(3)Scope

LOAD PLANNING, LOAD CONTROL MESSAGES AND COMMUNICATIONS, AND ISSUANCE OF LOAD CONTROL DOCUMENTS

(a)The scope of Commission Delegated Regulation (EU) 2025/20 does not cover the provision of load planning services, mass and balance calculations or load control messaging and communications, or the issuance of related documents. These activities are included in the scope of Regulation (EU) No 965/2012. When outsourced to a thirdparty provider, the responsibility for the safety of these services is covered by point ORO.GEN.205 of Regulation (EU) No 965/2012.

(b)The load control function is specific to the operator’s fleet and operational context. It may be performed by an organisation at an aerodrome or outside an aerodrome or by the personnel of the aircraft operator itself.

(c)The load control process is classified into two distinct phases:

(1)Phase 1: mass and balance (M&B) calculations, load planning, load control communications and messaging, and issuance of load control documents (load sheet, loading instructions/report (LIR) or notification to captain (NOTOC) when necessary). These activities may be executed from an aerodrome or a remote location.

(2)Phase 2: load control communication — that is, verification of load against the loading instructions and communication of any lastminute changes to the mass and balance documentation. These activities take place at an aerodrome, as part of the preparation of the aircraft for departure.

(d)The aircraft operator is responsible for ensuring the compliance of activities included in phase 1 — that is, mass and balance calculations, load planning, load control communications and messaging, and issuance of load control documents — with the relevant requirements of Regulation (EU) No 965/2012. This applies at all times, regardless of whether these tasks are performed by the aircraft operator itself or outsourced as a contracted activity. These activities are overseen by the competent authority of the aircraft operator.

(e)The GH organisation is responsible for the activities included in phase 2, which take place on an aircraft, at the aerodrome. These activities are overseen by the competent authority for GH of the aerodrome where they are performed.

GM · GM3 Article 2(3) — Regulations (EU) 2025/23 and 2025/24 · ED Decision 2025/007/R · Ground Handling Easy Access Rules · EAR revision 5 Nov 2025

All rules in Cover Regulation

Consolidated from the EASA Easy Access Rules (revision 5 Nov 2025, extracted 17 Aug 2026) for convenience. Not the official publication — verify against the Official Journal of the European Union and the EASA publications before operational use.

Ask Metis about GM3 Article 2(3) →

Metis opens with Avioverse in October 2026 · request early access.