Skip to content

A gradual release of Avioverse begins in October 2026. Request early access →

AMC2 FCL.125 ; FCL.235

ANNEX I (Part-FCL) · Regulation (EU) No 1178/2011 · EAR revision 25 Nov 2025

AMCAcceptable means of compliance

AMC2 FCL.125; FCL.235

CONTENTS OF THE SKILL TEST FOR THE ISSUE OF A LAPL(B) AND A BPL

(a)The take-off site should be chosen by the applicant depending on the actual meteorological conditions, the area which has to be over flown and the possible options for suitable landing sites. The applicant should be responsible for the flight planning and should ensure that all equipment and documentation for the execution of the flight are on board.

(b)An applicant should indicate to the FE the checks and duties carried out. Checks should be completed in accordance with the flight manual or the authorised checklist for the balloon on which the test is being taken. During pre-flight preparation for the test the applicant should be required to perform crew and passenger briefings and demonstrate crowd control. The load calculation should be performed by the applicant in compliance with the operations manual or flight manual for the balloon used.

FLIGHT TEST TOLERANCE

(c)The applicant should demonstrate the ability to:

(1)operate the balloon within its limitations;

(2)complete all manoeuvres with smoothness and accuracy

(3)exercise good judgment and airmanship;

(4)apply aeronautical knowledge;

(5)maintain control of the balloon at all times in such a manner that the successful outcome of a procedure or manoeuvre is never seriously in doubt.

CONTENT OF THE SKILL TEST

(d)The skill test contents and sections set out in this paragraph should be used for the skill test for the issue of a LAPL(B) (hot-air balloon) and a BPL (hot-air balloon):

SECTION 1 PRE-FLIGHT OPERATIONS, INFLATION AND TAKE-OFF
Use of checklist, airmanship, control of balloon by external visual reference, look-out procedures, etc. apply in all sections.
aPre-flight documentation, flight planning, NOTAM and weather briefing
bBalloon inspection and servicing
cLoad calculation
dCrowd control, crew and passenger briefings
eAssembly and layout
fInflation and pre-take-off procedures
gTake-off
hATC compliance(if applicable)
SECTION 2 GENERAL AIRWORK
aClimb to level flight
bLevel flight
cDescent to level flight
dOperating at low level
eATC compliance (if applicable)
SECTION 3 EN-ROUTE PROCEDURES
aDead reckoning and map reading
bMarking positions and time
cOrientation and airspace structure
dMaintenance of altitude
eFuel management
fCommunication with retrieve crew
gATC compliance
SECTION 4 APPROACH AND LANDING PROCEDURES
aApproach from low level, missed approach and fly on
bApproach from high level, missed approach and fly on
cPre-landing checks
dPassenger pre-landing briefing
eSelection of landing field
fLanding, dragging and deflation
gATC compliance (if applicable)
hActions after flight
SECTION 5 ABNORMAL AND EMERGENCY PROCEDURES
aSimulated fire on the ground and in the air
bSimulated pilot light and burner failures
cOther abnormal and emergency procedures as outlined in the appropriate flight manual.
dOral questions

(e)The skill test contents and sections set out in this paragraph should be used for the skill test for the issue of a LAPL(B) (gas balloon) and a BPL (gas balloon):

SECTION 1 PRE-FLIGHT OPERATIONS, INFLATION AND TAKE-OFF
Use of checklist, airmanship, control of balloon by external visual reference, look-out procedures, etc. apply in all sections.
aPre-flight documentation, flight planning, NOTAM and weather briefing
bBalloon inspection and servicing
cLoad calculation
dCrowd control, crew and passenger briefings
eAssembly and layout
fInflation and pre-take-off procedures
gTake-off
hATC compliance (if applicable)
SECTION 2 GENERAL AIRWORK
aClimb to level flight
bLevel flight
cDescent to level flight
dOperating at low level
eATC compliance (if applicable)
SECTION 3 EN-ROUTE PROCEDURES
aDead reckoning and map reading
bMarking positions and time
cOrientation and airspace structure
dMaintenance of altitude
eBallast management
fCommunication with retrieve crew
gATC compliance
SECTION 4 APPROACH AND LANDING PROCEDURES
aApproach from low level, missed approach and fly on
bApproach from high level, missed approach and fly on
cPre-landing checks
dPassenger pre-landing briefing
eSelection of landing field
fLanding, dragging and deflation
gATC compliance (if applicable)
hActions after flight
SECTION 5 ABNORMAL AND EMERGENCY PROCEDURES
aSimulated closed appendix during take-off and climb
bSimulated parachute or valve failure
cOther abnormal and emergency procedures as outlined in the appropriate flight manual
dOral questions

AMC · AMC2 FCL.125 — Regulation (EU) No 1178/2011 · ED Decision 2011/016/R · Aircrew Easy Access Rules · EAR revision 25 Nov 2025

All rules in SUBPART C – PRIVATE PILOT LICENCE (PPL) AND GYROPLANE PILOT LICENCE (GPL)

Consolidated from the EASA Easy Access Rules (revision 25 Nov 2025, extracted 17 Aug 2026) for convenience. Not the official publication — verify against the Official Journal of the European Union and the EASA publications before operational use.

Ask Metis about AMC2 FCL.125 →

Metis opens with Avioverse in October 2026 · request early access.