Skip to content

A gradual release of Avioverse begins in October 2026. Request early access →

GM1 ADR-DSN.B.040 Runways with stopways, or clearways

Certification Specifications and Guidance Material for Aerodrome Design (CS-ADR-DSN) — Issue 7 · Regulation (EU) No 139/2014 · EAR revision 13 Mar 2026

GMGuidance material

GM1 ADR-DSN.B.040Runways with stopways, or clearways

Where a runway is associated with a stopway or clearway, an actual runway length less than that resulting from application of GM1 ADR-DSN.B.035 as appropriate, may be considered satisfactory but, in such a case, any combination of runway, stopway, and clearway provided should permit compliance with the operational requirements for take-off and landing of the aeroplanes the runway is intended to serve.

GM · GM1 ADR-DSN.B.040 — Regulation (EU) No 139/2014 · ED Decision 2014/013/R · Aerodromes Easy Access Rules · EAR revision 13 Mar 2026

All rules in CHAPTER B — RUNWAYS

Consolidated from the EASA Easy Access Rules (revision 13 Mar 2026, extracted 17 Aug 2026) for convenience. Not the official publication — verify against the Official Journal of the European Union and the EASA publications before operational use.

Ask Metis about GM1 ADR-DSN.B.040 →

Metis opens with Avioverse in October 2026 · request early access.