For the purpose of the Acceptable Means of Compliance (AMC) and Guidance Material (GM) to Annex I (Part 21) to Regulation (EU) No 748/2012, the following definitions apply:

AuditIt refers to a systematic, independent, and documented process for obtaining evidence and objectively evaluating it to determine the extent to which the requirements are complied with. Note: audits may include inspections.
AssessmentIn the context of management system performance monitoring, continuous improvement, and oversight, it refers to a planned and documented activity that is performed by competent personnel to evaluate and analyse the achieved level of performance and maturity in relation to the organisation’s policy and objectives. Note: an assessment focuses on desirable outcomes and the overall performance, looking at the organisation as a whole. The main objective of the assessment is to identify the strengths and weaknesses to drive continual improvement. Remark: for ‘risk assessment’, please refer to the definition below.
CertificateIt is any certificate, approval, licence, authorisation, attestation or other document that is issued as the outcome of the certification process, which attests compliance with the applicable requirements.
CompetencyIt is a combination of individual skills, practical and theoretical knowledge, attitude, training, and experience.
CorrectionIt is the action to eliminate detected non-compliance.
Corrective actionIt is the action to eliminate or mitigate the root cause(s) and prevent the recurrence of existing detected non-compliance, or of any other undesirable condition or situation. Proper determination of the root cause(s) is crucial for defining effective corrective action to prevent reoccurrence.
ErrorIt is a person’s action or inaction that may lead to deviations from the accepted procedures or regulations. Note: errors are often associated with occasions when a planned sequence of mental or physical activities either fails to achieve its intended outcome, or is not appropriate with regard to the intended outcome, and when results cannot be attributed purely to chance.
FatigueIt is a physiological state of reduced mental or physical performance capability, resulting from sleep loss or extended wakefulness, circadian phase, or workload (mental and/or physical activity), which can impair a person’s alertness and ability to safely perform their tasks.
HazardIt is a condition or an object with the potential to cause, or contribute to, an aircraft incident or accident.
Human factors (HF)It is anything that affects human performance, which means principles that apply to aeronautical activities, and which seek safe interface between the human and other system components by proper consideration of human performance (ref. ICAO Doc 10151 — Human Performance (HP) Manual for Regulators).
Human performance (HP)It refers to human capabilities and limitations that have an impact on the safety and efficiency of aeronautical activities (ref. ICAO Doc 10151 — Human Performance (HP) Manual for Regulators).
InspectionIn the context of compliance monitoring and oversight, it refers to an independent and documented conformity evaluation by observation and judgement, which is accompanied, as appropriate, by measurements, testing or gauging, in order to verify compliance with the applicable requirements. Note: inspection may be part of an audit (e.g. product audit), but may also be conducted outside the normal audit plan; for example, to verify the closure of a particular finding.
‘Just culture’Ref. Article 2 of Regulation (EU) No 376/2014.
Near missIt is an event in which an occurrence to be mandatorily reported according to Regulation (EU) No 376/2014 was narrowly averted or avoided. Example: a staff member, on rechecking their work at the end of a task, realises that one work card step was not properly carried out.
Organisational factorIt is a condition that affects the effectiveness of safety risk controls, and is related to the culture, policies, processes, resources, and the workplace of an organisation.
Oversight planning cycleIt refers to the time frame within which the areas of the approval and the processes that are identified through a risk assessment should be reviewed by the competent authority by means of audits and inspections.
Oversight programmeIt refers to the detailed oversight schedule that defines the number of audits and other activities, including the scope and duration of each activity, as well as the details of product audits and locations, as appropriate, to be performed by the competent authority, and to the tentative time frame for performing each activity.
Preventive actionIt is the action to eliminate the cause of potential non-compliance, or any other undesirable potential situation.
Risk assessmentIt is an evaluation that is based on engineering and operational judgement and/or analysis methods in order to establish whether the achieved or perceived risk is acceptable or tolerable.
Safety cultureIt is an enduring set of values, norms, attitudes, and practices within an organisation, which is concerned with minimising the exposure of the workforce and the general public to dangerous or hazardous conditions. In a positive safety culture, a shared concern for, commitment to, and accountability for, safety is promoted.
Safety riskIt refers to the predicted probability and severity of the consequences or outcomes of a hazard.
Safety trainingIt refers to dedicated training to support safety management policies and processes, including HF training. Note 1: the main objective of the safety training programme is to ensure that personnel at all levels of the organisation maintain their competency to fulfil their roles safely. Safety training should, in particular, consider the safety knowledge that is derived from hazard identification and risk management processes, and forster a positive safety culture. Note 2: safety management training refers to specific training for the staff that are involved in safety management functions in accordance with points 21.A.139(c) and 21.A.239(c) of Part 21.
Working daysIt refers to days between, and including, Monday and Friday, except public holidays.

GM — Regulation (EU) No 748/2012 · ED Decision 2022/021/R · Initial Airworthiness Easy Access Rules · EAR revision 27 Nov 2025

All rules in General provisions