Skip to content

A gradual release of Avioverse begins in October 2026. Request early access →

AWO.B.CATII.105 CS AWO.B.CATII.105 Control of flight path

All Weather Operations (CS-AWO) · CS-AWO · EAR revision 14 Aug 2026

IRImplementing rule

AWO.B.CATII.105CS AWO.B.CATII.105 Control of flight path

The approach system shall either:

- (a) provide information of sufficient quality to the flight crew to permit the manual control of the aeroplane along the flight path within the prescribed limits; or - (b) automatically control the aeroplane along the flight path within the prescribed limits.

[Issue: CS-AWO/2]

IR · AWO.B.CATII.105 — CS-AWO · CS-AWO Easy Access Rules · EAR revision 14 Aug 2026

All rules in SUBPART B -APPROACH AND LANDING SECTION 3 -AIRWORTHINESS CERTIFICATION OF AEROPLANES FOR OPERATIONS WITH DECISION HEIGHTS (DHs) BELOW 60 M (200 FT) AND DOWN TO 30 M (100 FT) -CATEGORY II (CAT II) OPERATIONS

Consolidated from the EASA Easy Access Rules (revision 14 Aug 2026, extracted 17 Aug 2026) for convenience. Not the official publication — verify against the Official Journal of the European Union and the EASA publications before operational use.

Ask Metis about AWO.B.CATII.105 →

Metis opens with Avioverse in October 2026 · request early access.