Skip to content

A gradual release of Avioverse begins in October 2026. Request early access →

CS 25J951 General

Large Aeroplanes (CS-25) · CS-25 · EAR revision 26 Jan 2023

IRImplementing rule

CS 25J951 General

(a)Each fuel system must be constructed and arranged to ensure a flow of fuel at a rate and pressure established for proper APU functioning under each likely operating condition, including any manoeuvre for which certification is requested and during which the APU is permitted to be in operation.

(b)For essential APUs: Each fuel system must be arranged so that any air which is introduced into the system will not result in flameout.

(c)For essential APUs: Each fuel system for an essential APU must be capable of sustained operation throughout its flow and pressure range with fuel initially saturated with water at 26.7 °C and having 0.20 cm3 of free water per liter added and cooled to the most critical condition for icing likely to be encountered in operation.

[Amdt 25/1]

[Amdt 25/9]

IR — CS-25 · ED Decision 2010/005/R · CS-25 Easy Access Rules · EAR revision 26 Jan 2023

All rules in SUBPART J – AUXILIARY POWER UNIT INSTALLATIONS

Consolidated from the EASA Easy Access Rules (revision 26 Jan 2023, extracted 17 Aug 2026) for convenience. Not the official publication — verify against the Official Journal of the European Union and the EASA publications before operational use.

Ask Metis about CS 25J951 General →

Metis opens with Avioverse in October 2026 · request early access.