Skip to content

A gradual release of Avioverse begins in October 2026. Request early access →

AMC 25J943 APU Operating Characteristics

Large Aeroplanes (CS-25) · CS-25 · EAR revision 26 Jan 2023

AMCAcceptable means of compliance

AMC 25J943 APU Operating Characteristics

1 Compliance with CS 25J943 should be shown by design analysis and flight tests. The flight tests should include manoeuvre in which less than zero 'g' occurs for one continuous period of at least 5 seconds and a further manoeuvre with two periods of less than zero 'g' with a total time for these two periods of at least 5 seconds. 2 In the case of non-essential APUs, inadvertent shut-down due to negative accelerations is acceptable.

[Amdt 25/1]

AMC — CS-25 · ED Decision 2005/006/R · CS-25 Easy Access Rules · EAR revision 26 Jan 2023

All rules in SUBPART J – AUXILIARY POWER UNIT INSTALLATIONS

Consolidated from the EASA Easy Access Rules (revision 26 Jan 2023, extracted 17 Aug 2026) for convenience. Not the official publication — verify against the Official Journal of the European Union and the EASA publications before operational use.

Ask Metis about AMC 25J943 APU Operating Characteristics →

Metis opens with Avioverse in October 2026 · request early access.