IRImplementing rule
UAM.OP.VCA.300Approach and landing conditions
Before commencing an approach operation, the PIC shall be satisfied that:
(a)the meteorological conditions at the vertiport, diversion location or VEMS operating site will not prevent the PIC from conducting a safe approach, landing or go-around, considering the performance information contained in the operations manual (OM); and
(b)the established vertiport operating minima, or visibility and distance from cloud minima for flights conducted in accordance with VFR by day, shall be complied with.
IR · UAM.OP.VCA.300 — Regulation (EU) No 965/2012 · Regulation (EU) 2024/1111 · Air OPS Easy Access Rules · EAR revision 27 Mar 2026