LOAD CONTROL PROCESS
(a)The operator should ensure that the load control process covers at least the following:
(1)the functions and the tasks associated with each function are identified;
(2)mass and balance and load control documentation — including, as applicable, the loading instructions/report (LIR) and the NOTOC — is distributed to the relevant persons, as identified in the load control process;
(3)information related to aircraft loading and load distribution is communicated between the person responsible for loading supervision and the persons responsible for load planning and the related mass and balance and load control documentation is issued, along with any other designated intermediary person if load planning is a remote function that is not performed at the departure station;
(4)aircraft loading and load distribution are performed in accordance with the LIR;
(5)the mass and balance documentation and the LIR are not in contradiction and include any LMCs.
(b)Points (a)(2) and (a)(3) do not apply when the mass and balance documentation and loading/unloading of baggage are performed by the flight crew. [applicable from 27 March 2028 — ED Decision 2025/008/R]