Skip to content

A gradual release of Avioverse begins in October 2026. Request early access →

CHAPTER B — HELICOPTER OPERATING AREAS

Certification Specifications and Guidance Material for Heliport Design (CS-HPT-DSN) — Issue 1 · Aerodromes · Regulation (EU) No 139/2014 · CS HPT-DSN.B.100 – CS HPT-DSN.B.130

On this page
  1. CS HPT-DSN.B.100 Final approach and take-off areas (FATOs)

    Applicability: A heliport should be provided with at least one final approach and take-off area (FATO).

  2. GM1 HPT-DSN.B.100 Final approach and take-off areas (FATOs)

    General: A FATO may not be necessary to be provided at and aerodrome, where the runway is used for the purposes of final approach and take-off of…

  3. CS HPT-DSN.B.110 Helicopter clearways

    Applicability: When provided, a helicopter clearway should be located beyond the end of the FATO.

  4. GM1 HPT-DSN.B.110 Helicopter clearways

    General: A helicopter clearway would need to be considered when the heliport is intended to be used by helicopters operating in performance class 1.

  5. CS HPT-DSN.B.120 Touchdown and lift-off areas (TLOFs)

    General: At least one TLOF should be provided at a heliport.

  6. GM1 HPT-DSN.B.120 Touchdown and lift-off areas (TLOFs)

    Additional TLOFs may be located within runway-type FATOs.

  7. CS HPT-DSN.B.130 Safety areas

    General: A FATO should be surrounded by a safety area which need not be solid.

  8. GM1 HPT-DSN.B.130 Safety areas

    When only a single approach and take-off climb surface is provided, the need for specific protected side slopes should be determined by a safety…

Consolidated from the EASA Easy Access Rules (revision 13 Mar 2026, extracted 17 Aug 2026) for convenience. Not the official publication — verify against the Official Journal of the European Union and the EASA publications before operational use.

Ask Metis about CS HPT-DSN.B.100 – CS HPT-DSN.B.130 →

Metis opens with Avioverse in October 2026 · request early access.

ShareLinkedInX