Skip to content

A gradual release of Avioverse begins in October 2026. Request early access →

21L.B.203 Investigation of an application for the approval of a major repair design

Annex Ib · Regulation (EU) No 748/2012 · EAR revision 27 Nov 2025

IRImplementing rule

21L.B.203Investigation of an application for the approval of a major repair design

Upon receiving an application for the approval of a major repair design under this Annex, the Agency shall:

(a)conduct a review of the initial compliance demonstration plan and any subsequent update provided by the applicant in order to establish the completeness of the plan and the appropriateness of the proposed means and methods of demonstrating compliance with the type-certification basis and the applicable environmental protection requirements established and designated in accordance with point 21L.B.201; if the compliance demonstration plan is incomplete or the means and methods are not appropriate to achieve compliance demonstration, the Agency shall inform the applicant and request an amendment of it;

(b)when satisfied that the compliance demonstration plan provided is appropriate so that the applicant can demonstrate compliance, approve the compliance demonstration plan and any subsequent updates of the compliance demonstration plan;

(c)determine the likelihood of an unidentified non-compliance of the major repair design with the type-certification basis or with the applicable environmental protection requirements, and the potential impact of that non-compliance on the safety or environmental compatibility of the product, and determine on that basis whether a physical inspection and assessment of the first article of that product in the final configuration with the repair design is necessary in order to verify the compliance of the product with the applicable type-certification basis; the Agency shall notify the applicant before conducting this inspection and assessment;

(d)if, during the review of the compliance demonstration plan, the Agency determines that the major repair design contains any element for which an unidentified non-compliance with the type-certification basis or with the applicable environmental protection requirements may have an adverse impact on the safety or environmental compatibility of the changed product, the Agency shall determine which investigations are necessary in addition to those of point (c) in order to verify the compliance demonstration; the Agency shall notify the applicant of those additional investigations and which elements of the design would be subject to investigation.

IR · 21L.B.203 — Regulation (EU) No 748/2012 · Regulation (EU) 2022/1358 · Initial Airworthiness Easy Access Rules · EAR revision 27 Nov 2025

AMCAcceptable means of compliance

AMC1 21L.B.203(d)Investigation of an application for the approval of a major repair design

Show the text

PHYSICAL INSPECTION AND ASSESSMENT OF THE FIRST ARTICLE OF THE CHANGED PRODUCT (FIRST-ARTICLE INSPECTION) If EASA determines that there is a need to conduct a first-article inspection of the changed product under point 21L.B.203(c), then AMC2 21L.B.46(c) provides the description of this activity for EASA.

AMC · AMC1 21L.B.203(d) — Regulation (EU) No 748/2012 · ED Decision 2023/013/R · Initial Airworthiness Easy Access Rules · EAR revision 27 Nov 2025

All rules in SECTION B - PROCEDURES FOR COMPETENT AUTHORITIES

Consolidated from the EASA Easy Access Rules (revision 27 Nov 2025, extracted 17 Aug 2026) for convenience. Not the official publication — verify against the Official Journal of the European Union and the EASA publications before operational use.

Ask Metis about 21L.B.203 →

Metis opens with Avioverse in October 2026 · request early access.