Skip to content

A gradual release of Avioverse begins in October 2026. Request early access →

AMC E 820(a)(2) Over-torque Test

Engines (CS-E) · CS-E · EAR revision 7 Dec 2023

AMCAcceptable means of compliance

AMC E 820(a)(2) Over-torque Test

In order to comply with CS-E 820(a)(2), it should be shown that an over-torque event does not compromise the ability of the Engine to reach its Rated 30-Second/2-Minute OEI Power.

[Amdt No: E/1]

AMC — CS-E · ED Decision 2007/015/R · CS-E Easy Access Rules · EAR revision 7 Dec 2023

All rules in SUBPART E – TURBINE ENGINES: TYPE SUBSTANTIATION

Consolidated from the EASA Easy Access Rules (revision 7 Dec 2023, extracted 17 Aug 2026) for convenience. Not the official publication — verify against the Official Journal of the European Union and the EASA publications before operational use.

Ask Metis about AMC E 820(a)(2) Over-torque Test →

Metis opens with Avioverse in October 2026 · request early access.