Skip to content

A gradual release of Avioverse begins in October 2026. Request early access →

CS 25.1149 Propeller speed and pitch controls

Large Aeroplanes (CS-25) · CS-25 · EAR revision 26 Jan 2023

IRImplementing rule

CS 25.1149Propeller speed and pitch controls

(a)There must be a separate propeller speed and pitch control for each propeller.

(b)The controls must be grouped and arranged to allow –

(1)Separate control of each propeller; and

(2)Simultaneous control of all propellers.

(c)The controls must allow synchronisation of all propellers.

(d)The propeller speed and pitch controls must be to the right of, and at least 25 mm (one inch) below, the pilot’s throttle controls.

IR · CS 25.1149 — CS-25 · ED Decision 2003/2/RM · CS-25 Easy Access Rules · EAR revision 26 Jan 2023

All rules in SUBPART E – POWERPLANT

Consolidated from the EASA Easy Access Rules (revision 26 Jan 2023, extracted 17 Aug 2026) for convenience. Not the official publication — verify against the Official Journal of the European Union and the EASA publications before operational use.

Ask Metis about CS 25.1149 →

Metis opens with Avioverse in October 2026 · request early access.