Skip to content

A gradual release of Avioverse begins in October 2026. Request early access →

CS 25.683 Operation tests

Large Aeroplanes (CS-25) · CS-25 · EAR revision 26 Jan 2023

IRImplementing rule

CS 25.683Operation tests

(a)It must be shown by operation tests that when portions of the control system subject to pilot effort loads are loaded to 80% of the limit load specified for the system and the powered portions of the control system are loaded to the maximum load expected in normal operation, the system is free from –

(1)Jamming;

(2)Excessive friction; and

(3)Excessive deflection.

(b)It must be shown by analysis and, where necessary, by tests that in the presence of deflections of the aeroplane structure due to the separate application of pitch, roll and yaw limit manoeuvre loads, the control system, when loaded to obtain these limit loads and operated within its operational range of deflections can be exercised about all control axes and remain free from-

(1)Jamming;

(2)Excessive friction;

(3)Disconnection, and

(4)Any form of permanent damage.

(c)It must be shown that under vibration loads in the normal flight and ground operating conditions, no hazard can result from interference or contact with adjacent elements.

IR · CS 25.683 — CS-25 · ED Decision 2003/2/RM · CS-25 Easy Access Rules · EAR revision 26 Jan 2023

All rules in SUBPART D – DESIGN AND CONSTRUCTION

Consolidated from the EASA Easy Access Rules (revision 26 Jan 2023, extracted 17 Aug 2026) for convenience. Not the official publication — verify against the Official Journal of the European Union and the EASA publications before operational use.

Ask Metis about CS 25.683 →

Metis opens with Avioverse in October 2026 · request early access.