Skip to content

A gradual release of Avioverse begins in October 2026. Request early access →

I 25.6 Powerplant controls

Large Aeroplanes (CS-25) · CS-25 · EAR revision 26 Jan 2023

IRImplementing rule

I 25.6 Powerplant controls

(a)General

(1)In addition to the requirements of CS 25.1141, no single failure or malfunction, or probable combination thereof, of the ATTCS system, including associated systems, may cause the failure of any powerplant function necessary for safety.

(2)The ATTCS system must be designed to perform accurately its intended function without exceeding engine operating limits under all reasonably expected conditions.

(b)Thrust or Power Lever Control. The ATTCS system must be designed to permit manual decrease or increase in thrust or power up to the maximum thrust or power approved for use following engine failure during take-off through the use of the normal thrust or power controls, except that, for aeroplanes equipped with limiters that automatically prevent engine operating limits from being exceeded, other means may be used to increase thrust or power provided that the means is located in an accessible position on or close to the thrust or power levers, is easily identified, and operated under all operating conditions by a single action of either pilot with the hand that is normally used to actuate the thrust or power levers.

(c)System Control and Monitoring. The ATTCS system must be designed to provide –

(1)A means for checking prior to takeoff that the system is in an operable condition; and

(2)A means for the flight crew to deactivate the automatic function. This means must be designed to prevent inadvertent deactivation.

IR — CS-25 · ED Decision 2003/2/RM · CS-25 Easy Access Rules · EAR revision 26 Jan 2023

All rules in APPENDICES TO CS-25

Consolidated from the EASA Easy Access Rules (revision 26 Jan 2023, extracted 17 Aug 2026) for convenience. Not the official publication — verify against the Official Journal of the European Union and the EASA publications before operational use.

Ask Metis about I 25.6 Powerplant controls →

Metis opens with Avioverse in October 2026 · request early access.