GMGuidance material
GM1 to AMC2 ATS.TR.255; AMC3 ATS.TR.255 and AMC4 ATS.TR.255 Operations on parallel or near-parallel runways
DETERMINATION THAT AN AIRCRAFT IS ESTABLISHED ON RNP AR APCH
(a)An aircraft conducting an RNP AR APCH procedure (in accordance with Regulation (EU) 2018/1048) is considered to be established for the entire approach procedure after the IAF or the IF, as applicable, provided that:
(1)the aircraft confirms that it is established on the RNP AR APCH procedure prior to a designated point, the location of which is to be determined by the competent authority; [Figure or form omitted from this preview — available in the Avioverse workspace library.](2) the designated point is positioned on the RNP AR APCH to ensure the applicable horizontal separation minimum (e.g. 5.6 km (3 NM)) from the adjacent approach procedure (see Figure 59). The designated point may normally be coincident with the IAF; and
Figure 59: Established on RNP AR APCH concept (RNP AR APCH/precision approach with 3 NM separation minimum example)
(3)the designated point is readily apparent to the approach and monitoring air traffic controllers, to facilitate the application of the procedure. The designated point may be depicted on the situation display.
(b)Attention is drawn to the application of the appropriate wake turbulence separation between aircraft on the same approach, as established in ATS.TR.220.
(c)If, after reporting that it is established on the RNP AR APCH procedure, the aircraft is unable to execute the procedure, the pilot is expected to notify the air traffic controller immediately with a proposed course of action, and thereafter follow ATC instructions (e.g. break-out procedure).
(d)In circumstances where a break-out procedure becomes necessary during the application of the independent parallel approach procedure (for example, an aircraft penetrating the NTZ), monitoring controllers may issue climb and/or heading instructions to an aircraft established on an RNP AR APCH. Guidance on break-out procedures is contained in ICAO Doc 9643 ‘Manual on Simultaneous Operations on Parallel or Near-Parallel Instrument Runways (SOIR)’.
(e)To support a break-out instruction, an obstacle assessment is to be completed, in accordance with Regulation (EU) 2017/373. Guidance on obstacle assessment is contained in ICAO Doc 9643 ‘Manual on Simultaneous Operations on Parallel or Near-Parallel Instrument Runways (SOIR)’.
(f)Where appropriate, break-out procedures are published in the AIP and in the local instructions.
GM — Regulation (EU) 2017/373 · ED Decision 2020/008/R · ATM/ANS Easy Access Rules · EAR revision 12 Mar 2025