GENERAL
(a)The operator should track and monitor VEMS flights from take-off to landing.
(b)The operator should establish a detailed procedure describing how the aircraft tracking system is to be monitored, what actions are to be taken if a deviation or anomaly has been detected, and when those actions are to be taken.
OPERATIONAL PROCEDURE
(c)The operational procedure should take into account the following aspects:
(1)the outcome of the risk assessment conducted when the frequency of position reports was defined;
(2)the local environment of the intended operations; and
(3)the interface with the operator’s emergency response plan.
(d)Aircraft tracking data should be recorded on the ground and retained for at least 48 hours. Following an accident or a serious incident subject to investigation, the data should be retained for at least 30 days, and the operator should provide a copy of this data without delay.