IRImplementing rule
UAM.POL.VCA.120Take-off
(a)The take-off mass of the VCA shall not exceed the maximum take-off mass specified in the AFM for the certified take-off procedure or procedures to be used.
(b)The IAM operator shall take into account:
(1)the appropriate parameters of point UAM.POL.VCA.110(c); and
(2)the obstacles identified in accordance with point UAM.POL.VCA.115.
(c)In addition, for VCA operations from a FATO:
(1)the take-off mass shall be such that:
(i)it is possible to reject the take-off and land on the FATO if a CFP has been recognised at or before the take-off decision point (TDP);
(ii)the rejected take-off distance required (RTODRV) does not exceed the rejected take-off distance available (RTODAV); and
(iii)the TODRV does not exceed the TODAV, unless the VCA with a CFP recognised at or before the TDP can, when continuing the take-off, clear all obstacles to the end of the TODRV by a vertical margin of not less than 10,7 m (35 ft).
(2)That part of the take-off up to and including TDP shall be conducted in sight of the surface such that a rejected take-off can be conducted safely.
(d)For take-offs using a backup or lateral transition procedure, with a CFP recognised at or before the TDP, all obstacles in the backup or lateral transition area shall be cleared by an adequate margin.
IR · UAM.POL.VCA.120 — Regulation (EU) No 965/2012 · Regulation (EU) 2024/1111 · Air OPS Easy Access Rules · EAR revision 27 Mar 2026