Skip to content

A gradual release of Avioverse begins in October 2026. Request early access →

CAT.OP.MPA.140 Maximum distance from an adequate aerodrome for two-engined aeroplanes without an ETOPS approval

ANNEX IV (Part-CAT) · Regulation (EU) No 965/2012 · EAR revision 27 Mar 2026

IRImplementing rule

CAT.OP.MPA.140Maximum distance from an adequate aerodrome for two-engined aeroplanes without an ETOPS approval

(a)Unless approved by the competent authority in accordance with Subpart F of Annex V (Part-SPA), the operator shall not operate a two-engined aeroplane over a route that contains a point further from an adequate aerodrome, under standard conditions in still air, than the appropriate distance for the given type of aeroplane among the following:

(1)for performance class A aeroplanes with a maximum operational passenger seating configuration (MOPSC) of 20 or more, the distance flown in 60 minutes at the one-engine-inoperative (OEI) cruising speed determined in accordance with point (b);

(2)for performance class A aeroplanes with an MOPSC of 19 or less, the distance flown in 120 minutes or, subject to approval by the competent authority, up to 180 minutes for turbojet aeroplanes, at the OEI cruising speed determined in accordance with point (b);

(3)for performance class B or C aeroplanes, whichever is less:

(i)the distance flown in 120 minutes at the OEI cruising speed determined in accordance with point (b);

(ii)300 NM.

(b)The operator shall determine a speed for the calculation of the maximum distance to an adequate aerodrome for each two-engined aeroplane type or variant operated, not exceeding VMO (maximum operating speed) based upon the true airspeed that the aeroplane can maintain with one engine inoperative.

(c)The operator shall include the following data, specific to each type or variant, in the operations manual:

(1)the determined OEI cruising speed; and

(2)the determined maximum distance from an adequate aerodrome.

(d)To obtain the approval referred to in point (a)(2), the operator shall provide evidence that:

(1)procedures have been established for flight planning and dispatch;

(2)specific maintenance instructions and procedures to ensure the intended levels of continued airworthiness and reliability of the aeroplane including its engines have been established and included in the operator's aircraft maintenance programme in accordance with Annex I (Part-M) to Regulation (EU) No 1321/2014, including:

(i)an engine oil consumption programme;

(ii)an engine condition monitoring programme.

IR · CAT.OP.MPA.140 — Regulation (EU) No 965/2012 · Regulation (EU) 2019/1387 · Air OPS Easy Access Rules · EAR revision 27 Mar 2026

AMCAcceptable means of compliance

AMC1 CAT.OP.MPA.140(d)Maximum distance from an adequate aerodrome for two-engined aeroplanes without an ETOPS approval

Show the text

OPERATION OF NON-ETOPS-COMPLIANT TWIN TURBO-JET AEROPLANES WITH MOPSC OF 19 OR LESS BETWEEN 120 AND 180 MINUTES FROM AN ADEQUATE AERODROME For operations between 120 and 180 minutes, the operator should include the relevant information in its operations manual (OM) and its maintenance procedures. The aeroplane should be certified to CS-25 or equivalent (e.g. FAR-25)

(c)Engine events and corrective action

(1)All engine events and operating hours should be reported by the operator to the airframe and engine type certificate (TC) holders, as well as to the competent authority.

(2)These events should be evaluated by the operator in consultation with the competent authority and with the engine and airframe TC holders. The competent authority may consult EASA to ensure that worldwide data is evaluated.

(3)Where statistical assessment alone is not applicable, e.g. where the fleet size or accumulated flight hours are small, individual engine events should be reviewed on a case-by-case basis.

(4)The evaluation or statistical assessment, when available, may result in corrective action or the application of operational restrictions.

(5)Engine events could include engine shutdowns, both on-ground and in-flight, excluding normal training events, including flameout, occurrences where the intended thrust level was not achieved or where crew action was taken to reduce thrust below the normal level for whatever reason, and unscheduled removals.

(6)The operator should ensure that all corrective actions required by the competent authority are implemented.

(d)Maintenance

(1)The operator’s oil-consumption-monitoring programme should be based on engine manufacturer’s recommendations, if available, and track oil consumption trends. The monitoring should be continuous and take account of the oil added.

(2)The engine monitoring programme should also provide for engine condition monitoring describing the parameters to be monitored, the method of data collection and a corrective action process, and should be based on the engine manufacturer’s instructions. This monitoring will be used to detect propulsion system deterioration at an early stage allowing corrective action to be taken before safe operation is affected.

(e)Flight crew training The operator should establish a flight crew training programme for this type of operation that includes, in addition to the requirements of Subpart FC (Flight Crew) of Annex III (Part-ORO), particular emphasis on the following:

(1)Fuel management: verifying required fuel on board prior to departure and monitoring fuel on board en-route, including calculation of fuel remaining. Procedures should provide for an independent cross-check of fuel quantity indicators, e.g. fuel flow may be used to calculate the fuel burned, which may be compared with the indicated fuel remaining. It should be confirmed that the fuel remaining is sufficient to satisfy the critical fuel reserves.

(2)Procedures for single and multiple failures in flight that may give rise to go/no-go and diversion decisions — policy and guidelines to aid the flight crew in the diversion decision-making process and emphasising the need for constant awareness of the closest weather-permissible alternate aerodrome in terms of time.

(3)OEI performance data: drift-down procedures and OEI service ceiling data.

(4)Meteorological reports and flight requirements: meteorological aerodrome reports (METARs) and terminal aerodrome forecast (TAF) reports and obtaining in-flight weather updates on the en-route alternate (ERA), destination and destination alternate aerodromes. Consideration should also be given to forecast winds, including the accuracy of the forecast compared to actual wind experienced during flight and meteorological conditions along the expected flight path at the OEI cruising altitude and throughout the approach and landing.

(f)Pre-departure check A pre-departure check, additional to the pre-flight inspection required by Part-M and designed to verify the status of the aeroplane’s significant systems, should be conducted. Adequate status monitoring information on all significant systems should be available to the flight crew to conduct the pre-departure check. The content of the pre-departure check should be described in the OM. The operator should ensure that flight crew members are fully trained and competent to conduct a pre-departure check of the aeroplane. The operator’s required training programme should cover all relevant tasks, with particular emphasis on checking required fluid levels.

(g)MEL The operator should establish in its MEL the minimum equipment that has to be serviceable for non-ETOPS operations between 120 and 180 minutes. The operator should ensure that the MEL takes into account all items specified by the manufacturer relevant to this type of operations.

(h)Dispatch/flight planning rules The operator should establish dispatch procedures that address the following:

(1)Fuel and oil supply: for releasing an aeroplane on an extended range flight, the operator should ensure that it carries sufficient fuel and oil to meet the applicable operational requirements and any additional fuel that may be determined in accordance with the following:

(i)Critical fuel scenario: in establishing the critical fuel reserves, the applicant is to determine the fuel necessary to fly to the most critical point of the route and execute a diversion to an alternate aerodrome assuming a simultaneous failure of an engine and the cabin air pressurisation system. The operator should carry additional fuel for the worst-case fuel burn condition (one engine versus two engines operating) if this is greater than the additional fuel calculated in accordance with the fuel requirements in CAT.OP.MPA, in order to:

(A)fly from the critical point to an alternate aerodrome:

(a)at 10 000 ft; or

(b)at 25 000 ft or the single-engine ceiling, whichever is lower, provided that all occupants can be supplied with and use oxygen for the time required to fly from the critical point to an alternate aerodrome;

(B)descend and hold at 1 500 ft for 15 minutes in standard conditions;

(C)descend to the applicable MDA/DH followed by a missed approach (taking into account the complete missed approach procedure); followed by

(D)a normal approach and landing.

(ii)Ice protection: additional fuel used when operating in icing conditions (e.g. operation of ice protection systems (engine/airframe as applicable)) and, when manufacturer’s data is available, take account of ice accumulation on unprotected surfaces if icing conditions are likely to be encountered during a diversion.

(iii)APU operation: if an APU has to be used to provide additional electrical power, consideration should be given to the additional fuel required.

(2)Communication facilities: the operator should ensure the availability of communications facilities in order to allow reliable two-way voice communications between the aeroplane and the appropriate ATC unit at OEI cruise altitudes.

(3)Aircraft technical log review to ensure that proper MEL procedures, deferred items, and required maintenance checks have been completed.

(4)ERA aerodrome(s): the operator should ensure that ERA aerodromes are available for the intended route, within the distance flown in 180 minutes based upon the OEI cruising speed, which is a speed within the certified limits of the aeroplane, selected by the operator and approved by the competent authority, confirming that, based on the available meteorological information, the weather conditions at ERA aerodromes are at or above the applicable minima for the applicable period of time , in accordance with CAT.OP.MPA.182.

AMC · AMC1 CAT.OP.MPA.140(d) — Regulation (EU) No 965/2012 · ED Decision 2022/014/R · Air OPS Easy Access Rules · EAR revision 27 Mar 2026

GMGuidance material

GM1 CAT.OP.MPA.140(c)Maximum distance from an adequate aerodrome for two-engined aeroplanes without an ETOPS approval

Show the text

ONE-ENGINE-INOPERATIVE (OEI) CRUISING SPEED The OEI cruising speed is intended to be used solely for establishing the maximum distance from an adequate aerodrome.

GM · GM1 CAT.OP.MPA.140(c) — Regulation (EU) No 965/2012 · ED Decision 2014/015/R · Air OPS Easy Access Rules · EAR revision 27 Mar 2026

GMGuidance material

GM1 CAT.OP.MPA.140(d)Maximum distance from an adequate aerodrome for two-engined aeroplanes without an ETOPS approval

Show the text

SIGNIFICANT SYSTEMS

(a)Definition: Significant systems to be checked are the aeroplane propulsion system and any other aeroplane systems whose failure could adversely affect the safety of a non-ETOPS diversion flight, or whose functioning is important to continued safe flight and landing during an aeroplane diversion.

(b)When defining the pre-departure check, the operator should give consideration, at least, to the following systems:

(1)electrical;

(2)hydraulic;

(3)pneumatic;

(4)flight instrumentation, including warning and caution systems;

(5)fuel, including potential leakage, fuel drains, fuel boost and fuel transfer;

(6)flight control;

(7)ice protection;

(8)engine start and ignition;

(9)propulsion system instruments;

(10)engine thrust reversers;

(11)navigation and communications, including any route specific long-range navigation and communication equipment;

(12)back-up power systems (i.e. emergency generator and auxiliary power unit);

(13)air conditioning and pressurisation;

(14)cargo fire detection and suppression;

(15)propulsion system fire detection and suppression;

(16)emergency equipment (e.g. ELT, hand fire extinguisher, etc.).

GM · GM1 CAT.OP.MPA.140(d) — Regulation (EU) No 965/2012 · ED Decision 2021/005/R · Air OPS Easy Access Rules · EAR revision 27 Mar 2026

All rules in SUBPART B: OPERATING PROCEDURES

Consolidated from the EASA Easy Access Rules (revision 27 Mar 2026, extracted 17 Aug 2026) for convenience. Not the official publication — verify against the Official Journal of the European Union and the EASA publications before operational use.

Ask Metis about CAT.OP.MPA.140 →

Metis opens with Avioverse in October 2026 · request early access.