Skip to content

A gradual release of Avioverse begins in October 2026. Request early access →

GM1 ADR-DSN.T.915 Siting of equipment and installations on operational areas

Certification Specifications and Guidance Material for Aerodrome Design (CS-ADR-DSN) — Issue 7 · Regulation (EU) No 139/2014 · EAR revision 13 Mar 2026

GMGuidance material

GM1 ADR-DSN.T.915Siting of equipment and installations on operational areas

(a)The design of light fixtures and their supporting structures, light units of visual approach slope indicators, signs and markers is specified in CS ADR-DSN.M.615, CS ADR-DSN.M.640, CS ADR-DSN.N.775, and the certification specifications of Chapter P respectively.

(b)Guidance on siting of equipment and installations on operational areas is given in ICAO Doc 9157, Aerodrome Design Manuals, Part 2, Taxiways, Aprons and Holding Bays and Part 6, Frangibility.

(c)Guidance on the frangible design of visual and non-visual aids for navigation is given in the ICAO Doc 9157, Aerodrome Design Manual, Part 5, Electrical Systems.

(d)Requirements for obstacle limitation surfaces are specified in the certification specifications of Chapter J.

(e)The term ‘aircraft safety purposes’ refers to the installation of arresting systems.

[Issue: ADR-DSN/3]

[Issue: ADR-DSN/5]

[Issue: ADR-DSN/6]

GM · GM1 ADR-DSN.T.915 — Regulation (EU) No 139/2014 · ED Decision 2022/006/R · Aerodromes Easy Access Rules · EAR revision 13 Mar 2026

All rules in CHAPTER T — AERODROME OPERATIONAL SERVICES, EQUIPMENT AND INSTALLATION

Consolidated from the EASA Easy Access Rules (revision 13 Mar 2026, extracted 17 Aug 2026) for convenience. Not the official publication — verify against the Official Journal of the European Union and the EASA publications before operational use.

Ask Metis about GM1 ADR-DSN.T.915 →

Metis opens with Avioverse in October 2026 · request early access.