Skip to content

A gradual release of Avioverse begins in October 2026. Request early access →

GM1 ADR-DSN.T.910 Equipment frangibility requirements

Certification Specifications and Guidance Material for Aerodrome Design (CS-ADR-DSN) — Issue 7 · Regulation (EU) No 139/2014 · EAR revision 13 Mar 2026

GMGuidance material

GM1 ADR-DSN.T.910Equipment frangibility requirements

(a)Equipment and supports required to be frangible should be designed and constructed so that they should break, distort, or yield in the event that they are accidentally impacted by an aircraft. The design materials selected should preclude any tendency for the components, including the electrical conductors, etc., to ‘wrap around’ the colliding aircraft or any part of it.

(b)Frangible structures should be designed to withstand the static and operational wind or jet blast loads with a suitable factor of safety but should break, distort, or yield readily when subjected to the sudden collision forces of a 3 000 kg aircraft airborne and travelling at 140 km/h (75 kt), or moving on the ground at 50 km/h (27 kt).

(c)Guidance on design for frangibility is contained in ICAO Doc 9157, Aerodrome Design Manual, Part 6, Frangibility.

[Issue: ADR-DSN/3]

GM · GM1 ADR-DSN.T.910 — Regulation (EU) No 139/2014 · ED Decision 2016/027/R · Aerodromes Easy Access Rules · EAR revision 13 Mar 2026

All rules in CHAPTER T — AERODROME OPERATIONAL SERVICES, EQUIPMENT AND INSTALLATION

Consolidated from the EASA Easy Access Rules (revision 13 Mar 2026, extracted 17 Aug 2026) for convenience. Not the official publication — verify against the Official Journal of the European Union and the EASA publications before operational use.

Ask Metis about GM1 ADR-DSN.T.910 →

Metis opens with Avioverse in October 2026 · request early access.